Mule Town Concrete logoMule Town ConcreteColumbia, TNText Lane
WORK ORDERS-09

Finishes & Control Joints

Broom or smooth troweled finishes, and saw-cut control joints placed to guide cracking where it belongs.

Job
Broom and smooth finishes, saw-cut control joints
Area
Maury & Williamson counties, TN
Contractor
Lane McCrary
Text Lane · (931) 922-1252
Short answer

Mule Town Concrete finishes concrete with a broom, smooth troweled or stamped surface and saw-cuts control joints to guide where the slab cracks, on driveways, patios, walks, slabs and floors in Columbia and across Maury and Williamson counties. Text Lane at (931) 922-1252 with questions about a finish.

Scope

Broom and smooth finishes, saw-cut control joints from Mule Town Concrete

Broom or smooth troweled finishes, and saw-cut control joints placed to guide cracking where it belongs.

How Lane runs it

The order of work

  1. Look over photos and the spot with you
  2. Grade and form so it lands level and true
  3. Pour, screed, float and finish
  4. Saw-cut control joints where they're needed

Where

Finishes & Control Joints across Maury and Williamson counties

Quote

What to text Lane

  • Your town
  • Photos of the spot
  • Rough size
  • What you need poured

Field note 02

Broom finish

A broom finish is made by dragging a broom across the fresh surface. The fine ridges give traction, which is why it's the usual choice for driveways, walks and outdoor slabs that get wet.

Field note 03

Smooth troweled finish

A smooth finish is troweled flat and tight. It sweeps clean and suits garage and shop floors and other indoor slabs.

Field note 04

Stamped finish

Stamped concrete presses a pattern into the surface for a decorative look on patios, walks and drives.

Field note 05

Saw-cut control joints

Concrete cracks as it shrinks and moves. Control joints are cuts made in the slab to give those cracks a straight, planned place to happen. They're laid out to split the slab into panels. This is the 'cutting lines' part of the Mule Town Concrete motto.

Field note 06

Why finishing and joints decide how a slab ages

Finishing is where a slab gets its surface: floating the mud to bring the paste up, edging the sides, and then the final texture, whether that is a broom finish for grip, a smooth trowel finish for a shop floor or a decorative surface. The timing is set by the weather and the mix, not the clock, which is why the crew stays with the slab until it is ready.

Concrete shrinks as it cures, and that shrinkage has to go somewhere. Control joints give it a planned place to crack, in a straight line, below the surface. Joints are either tooled in while the concrete is fresh or saw cut once it can take the blade. Spacing and depth matter, and so does cutting them at the right time, which is the 'cutting lines' half of the Mule Town Concrete tagline.

If you have an existing slab with cracks wandering across it, missing joints are often part of the story. When you plan new work, ask Lane where the joints will go and why. Text (931) 922-1252 with photos and your town to talk through the finish and joint layout for your job.

Questions on the ticket

Frequently asked

Q1Why does concrete need control joints?

Concrete shrinks as it cures and moves with temperature. Joints give it a planned place to crack.

Q2Which finish should I choose?

Broom for traction outdoors, smooth for floors you sweep, and stamped for a decorative look.

Q3Can you add joints to existing concrete?

Text Lane photos and he can tell you what the slab needs.

Sign-off

Text Lane.

(931) 922-1252

Send your town, what you need poured and a couple of photos.

Text Lane · (931) 922-1252